Negotiable
The date of payment from buyers deliver within days
Beijing
Long-term effective
2017-09-21 20:55
30
Company Profile
By certification [File Integrity]
Contact:highlingdredger(Ms.)
Email:
Telephone:
Area:Beijing
address: No. 01599, Xiangjiang West Street, Advanced Manufactur Industrial Park, Binhai Economy Development Zone, Weifang, Shandong, China (261108)
Website: http://highlingdredger.rkxjmzj.com/
| HL400 | |
| Dredger LOA | 26.0m |
| Hull size | 19.0x7.5x2.0m |
| Main pontoon | 13.8x3.5x2.0m |
| Side pontoon | 19.0x2.0x2.0m |
| Structure | can be dismantle and re-assemble easily ,box structure, lower delivery cost |
| Main engine brand and power | Cummins /522kW |
| Auxiliary engine brand and power | Cummins/224kW |
| Harbour generator | Cummins/30kw |
| Dredging pump | Warman technology |
| Discharge pipe innerdiameter | 400mm |
| Head | 45m |
| Max dredging depth | 13m |
| Water flow | 2500m/h |
| Solid sand capacity | 500m/h |
| Discharge distance | 1500m |
| Cutter head diameter | 1450mm |
| Cutter power | 70kW |
| Draught | 1.4m |
| Displacement | 180T |
| Hydraulic control system | PLC siemens |
| Wire rope pulling force (lifting winch )*quantity | 80kn* 1 |
| Wire rope pulling force (traversing winch )*quantity | 80kn* 2 |
| Operation room | adjustable chair, movable side-window, air condition, PLC system, signal lights and floodlights |
| Total weight | 110T |
| Total power | 746kW |
| Total fuel oil consumption | 112L/H |